﻿<?xml version="1.0" encoding="utf-8"?>
<rdf:Description rdf:about="https://calm.cambridgeshire.gov.uk:443/record/catalog/KHCP/8/18" xmlns:rdf="http://www.w3.org/1999/02/22-rdf-syntax-ns#" xmlns:dc="http://purl.org/dc/elements/1.1/">
  <dc:title>Bedford and Cambridge Railway</dc:title>
  <dc:description>Passing through parishes: Bedford St Mary, Cardington, Cople, Willington, Blunham, Sandy, Everton (all Bedfordshire); Gamlingay (Cambridgeshire); Waresley, Little Gransden (Huntingdonshire); Long Stow [Longstowe], Bourne [Bourn], Kingston, Toft, Great Eversden, Comberton, Barton, Grantchester, Trumpington, Cambridge St Andrew the Less (Cambridgeshire).  Engineers: Robert Stephenson and M.A. Borthwick  Surveyor: C.F. Cheffins  Full title: Bedford and London &amp; Birmingham Railway Cambridge Extension  Historical note: scheme not progressed  Related material: plans &amp; sections only at CRO Q/RUm15</dc:description>
  <dc:date>30 November 1845</dc:date>
</rdf:Description>