﻿<?xml version="1.0" encoding="utf-8"?>
<rdf:Description rdf:about="https://calm.cambridgeshire.gov.uk:443/record/catalog/KHCP/8/4" xmlns:rdf="http://www.w3.org/1999/02/22-rdf-syntax-ns#" xmlns:dc="http://purl.org/dc/elements/1.1/">
  <dc:title>London and Birmingham Railway. Branch from near Blisworth to Peterborough</dc:title>
  <dc:description>Passing through parishes: Blisworth, Milton Malsor, Rothersthorpe, Wootton, Hardingstone, Northampton St Giles... Nassington, Elton (all Northamptonshire); Sibson cum Stibbington (Huntingdonshire), Castor (Northamptonshire); Alwalton, Overton [Orton] Waterville, Overton Longville [Orton Longueville], Woodston, Fletton (all Huntingdonshire)  Engineer: Robert Stephenson  Surveyor: C.F. Cheffins  Full title: 'Railway commencing by the London and Birmingham Railways in the parish of Gayton terminating Peterborough in the County of Northampton' (scheme in fact commences in parish of Blisworth)  Historical note: act obtained July 1843 (6 &amp; 7 Vict. cap. lxiv). Line opened Blisworth to Northampton May 1845, Northampton to Peterborough June 1845. </dc:description>
  <dc:date>30 November 1842</dc:date>
</rdf:Description>